Commercial Solar
25-year panel warrantyCommercial panels, three-phase inverters
Rooftop systems from 50 kW to 1 MW that cut the daytime bill of offices, warehouses and shops.
Mon – Fri 8am – 6pm, Sat 9am – 1pm · Free home surveys
Free survey (555) 016-2290
Commercial solar
Rooftops, carports and workplace chargers from 50 kW to 1 MW, designed around your load and connected over a weekend.
Services
25-year panel warrantyCommercial panels, three-phase inverters
Rooftop systems from 50 kW to 1 MW that cut the daytime bill of offices, warehouses and shops.
25-year panel warrantyGalvanised canopy, bifacial panels
Steel canopies with panels on top: shade and shelter for cars, clean power for the building.
3-year charger warranty22 kW dual posts, load management
Charging posts for staff, visitors and fleets, with load balancing and payment built in.

How we work
We size the system from your half-hourly data, not a guess.
Your business keeps running while we work.
One contract for design, permits, install and grid.
We watch the output and fix faults before you notice.
Portfolio
CommercialHarbor Business Park
Farms & ruralGreenfield Farm, Upton
CommercialRiverside Office Park
Farms & ruralHillside Road, Upton
CommercialOld Mill Quarter
Schools & communityLakeside
Leadership
11 years with usCommercial projects manager
Project management professional
Warehouses, carports and schools
City office
9 years with usSolar design engineer
Professional engineer (PE)
System design and shade studies
Design studio
15 years with us
18 years with usFounder & managing director
Licensed electrical contractor
Home and community solar
Head office
Reviews
They connected 420 kW over one weekend and we never stopped a single truck. Payback is under five years.
The carport gives shade, power and chargers in one. Staff fight over the bays under the panels.
Installed in the summer break, switched on at the first assembly of term. The children check the lobby screen every morning.
Send us twelve months of bills. We reply with a design, a price and a payback forecast within ten working days.