Mon – Fri 8am – 6pm, Sat 9am – 1pm · Free home surveys

Free survey (555) 016-2290

Lakeside Primary School

A 150 kW system installed in the summer break, with a live screen in the lobby for pupils.

Lakeside Primary wanted to cut its bill and teach pupils about energy. We installed 150 kW on the hall and classroom roofs during the summer break.

A screen in the lobby shows what the roof is making, and every class has a lesson pack.

How the install ran

  1. SpringGrant application and design
  2. Summer week 1Scaffold and rails
  3. Summer weeks 2–3Panels, inverters and display
  4. First day of termSwitch-on assembly
Call now Quote