Mon – Fri 8am – 6pm, Sat 9am – 1pm · Free home surveys

Free survey (555) 016-2290

What happens on install day?

Most of our home installs take one day. Here is how a typical day runs.

Hour by hour

  1. 8am: the crew arrives, sets up the roof safety system and covers the drive
  2. 9am: rails go on the roof
  3. 11am: panels are lifted and fixed
  4. 1pm: cables run to the inverter or battery
  5. 3pm: testing and a walk-through with you
  6. 4pm: the crew tidies up and leaves

The system is switched on once the utility approves it, usually within two weeks.

Leave a Reply

Your email address will not be published. Required fields are marked *

Call now Quote