Mon – Fri 8am – 6pm, Sat 9am – 1pm · Free home surveys

Free survey (555) 016-2290

Harbor Logistics Warehouse

A 420 kW flat-roof system that covers the whole working day of a busy distribution hub.

A logistics company with refrigerated loading bays wanted to cut its daytime bill. We fitted 976 panels on ballasted frames, so the roof membrane was never drilled.

The system was connected over one weekend. Payback is forecast at four years and nine months.

How the install ran

  1. Weeks 1–2Load analysis and structural check
  2. Weeks 3–6Design, permits and grid application
  3. Weeks 7–9Install, floor by floor of the roof
  4. Week 10Weekend connection and handover
Call now Quote